DIG After Dark · Production Hub

/ops/afterdark

Technical landing and control surface

Single source for cue package status, AV readiness, run-of-show sequencing, and revision governance.

Approved package: 2026.06.14-r3 2 download bundles 4 run steps

Current approval

2026.06.14-r3

Adjusted phase 3 transients and updated cue manifest naming.

Cue packageAfter Dark Main Package2026.06.14-r3 · 1.8 GB
AV readinessTiered spec loaded3 tiers · calibration checklist ready
Run of show4 step sequenceTransitions and contingencies defined
Revision stateapproved2026-06-14
A/D
After Dark module

Control modules

Open the production documents

Operator notes

  • Treat phase transitions as emotional handoffs, not just technical cuts.
  • Watch room reaction and tactile coherence before pushing intensity.
  • Always announce when switching to fallback package in comms channel.
  • Log calibration context with each revision to preserve provenance.