/ops/afterdark/revisions

Revision control and provenance

Current approved: 2026.06.14-r3 (2026-06-14)

2026.06.14-r3 2026-06-14 approved

Adjusted phase 3 transients and updated cue manifest naming.

Evidence: Calibration Room B report + operator sign-off

  • Main package bundle
  • Manifest v3
  • AV note addendum
2026.06.10-r2 2026-06-10 superseded

Added safe dynamics pack and fallback routing.

Evidence: Playback resilience test run #5

  • Safe package
  • Fallback matrix
  • Operator memo
2026.06.05-r1 2026-06-05 archived

Initial deterministic cue set and baseline AV assumptions.

Evidence: Generator seed table v1

  • Initial bundle
  • Seed config
  • Test captures